Best housing construction steps

House decoration is indeed a headache, but all the things that happen are for us to solve. The expert advice allows you to decorate your home without worrying about your new home and happy.

1 Preliminary Design - 2 Main Body Dismantlement - 3 Hydroelectricity Renovation - 4 Carpentry - 5 Tiling - 6 Brush Wall Paint - 7 Kitchen & Bathroom Ceiling - 8 Cabinet Installation - 9 Door Installation - 10 Flooring Installation - -11 Paving Wallpaper - 12 Radiator Installation - -13 Switching Socket Installation - -14 Lighting Fixture - -15 Hardware Ware Installation - 16 Curtain Rod Installation - 17 Vast Cleaning - 18 Furniture Approach - 19 Appliance installation - 20 homes are completed, roughly in accordance with these 20 steps.

❤ (a) pre-design

In the same way, the difference between humans and bees is that the construction of bees is a reflection of instincts. Before humans are built, ideas and frameworks are first formed in the mind. Therefore, if the home improvement compared to a battle, then the pre-design home improvement is the battle of the "war plan" is the home improvement "soul link."

In the previous design, one of the things that my friends must do is to make a detailed measurement of their own room. Don't be lazy. It's best to measure it yourself. The main contents of the measurement include:

1. Identify the area involved in the renovation process. Especially the tiling area, wall paint area, wallpaper area, floor area;

2, clear the main wall size. In particular, it is necessary to design the wall size of the furniture later.

❤ (2) Demolition of the main body

Into the construction phase, the main demolition reform is the first project on the first, mainly including the demolition of walls, walls, spade shovel, demolition heating, change steel windows and so on. When the main body is dismantled and reformed, it is to put the framework of the construction site first.

❤ (III) Hydropower Rehabilitation

Before the transformation of the water circuit, the demolition of the main structure should be basically completed. Between the two stages of hydropower reform and main body demolition and reform, some relevant suggestions have been made on the positions of the water inlets and hoods reserved by developers. mainly include:

1. Check if the position of the socket outlet affects the installation of the hood in the future;

2, see if the location of the water meter is appropriate;

3, to see if the position of the inlet is convenient for installing the sink later.

For the first measurement of the cabinet, a slightly experienced friend can do it completely. After the waterway is completed, it is best to do the waterproofing of the bathroom. The kitchen does not generally need to be waterproof.

❤ (four) woodworking

Carpenters, bricklayers, and oil workers are the "three brothers" in the construction process. The basic order of appearance is: wood-tile-oil. The basic appearance principle is - who is dirty and who is the first. "Who is dirty? Whoever is above" is also one of the basic principles that determine the order of home improvement.

❤ (five) tiling

In the process of “bricklayer”, the following three steps are also involved:

1. The installation of door stone and marble windowsill. The installation of the door stone can be done together with the paving tiles, or after the paving tiles, the installation of the marble window sill is usually done after the window cover is done. The marble worker will prepare the glass glue, and the marble and the window cover are sealed with glass glue. Now.

2, the installation of floor drain. The floor drain is the first one to appear in the home improvement hardware because it needs to be installed together with the floor tile. Therefore, when friends start shopping for building materials, they should try to buy a floor drain.

3, hood installation. The hood is the first appearance of the appliance. After the kitchen tiles are laid, you can consider installing the hood.

“The bricklayer's second cousin” leaves the floor. At this time, the cabinet can be measured for the second time. Accurately speaking, after the wall tiles have been attached and the hood is installed, the second measurement of the cabinet can be performed.

❤ (six) brush wall paint

The “oil worker's third child” entered the field and mainly completed the work of basic wall surface treatment, brush finish, and painting of furniture hit by the “wooden boss”. For friends who are ready to put on wallpapers, they only need to let the “oil worker's third child” do grassroots work on the wallpapered wall.

❤ (7) kitchen ceiling

Cupboard ceiling as the installation of the first team, or in the continuation of the home "packaging." At the same time as the kitchen ceiling, the kitchen's moisture-proof ceiling lamp and exhaust fan (Yuba) should have been bought. It is best for friends to install ceiling lights and exhaust fans (bath heaters) at the same time, or to leave heads and openings.

❤ (8) Kitchen cabinet installation

After the ceiling is over, the cabinet door can be installed. If it goes well, one day can be completed. At the same time there is a sink (can not include water and water parts) and gas stove, the best coordination of the property before the installation of the gas pass, because the gas stove installed after the need to test gas.

A lot of friends kitchen and bathroom ceiling selection of waterproof gypsum board with waterproof paint, decoration team offer is generally more than 120 yuan per square meter, than the average aluminum buckle plate, PVC buckle plate ceiling should be expensive. The gypsum board ceiling looks relatively flat from the visual, but once there is a problem with the top surface water pipe, or if the leakage above the floor requires downstairs maintenance, etc., the gypsum board ceiling needs to be removed as a whole, which is much more costly than the buckle board ceiling. Therefore, we need to be cautious when choosing plasterboard ceilings.

❤ (nine) wooden door installation

On the second day of cabinet installation, as soon as the wooden door measurement was completed more than one month ago, it is now possible to install it. If it goes well, it is also the time of the day. The hinges, door locks, and suctions to be installed at the same time when the door is installed. Prepare related hardware in advance.

If you want the wooden door manufacturers to install window covers and gargles, they should be measured together when the wooden door manufacturers measure them, and they should be installed on the same day that the wooden door is installed. At the same time, the installation time of the marble window sill should be considered wrong. After installation. Remarks: The production period of wooden doors is generally one month. Therefore, in order to make the construction period close together, it is necessary to allow door manufacturers to measure the size of door openings as soon as possible after the completion of main body demolition. With regard to the handling of door openings, we need to pay attention to the fact that if the height of the door openings is inconsistent, the workers need to be treated as if they are equal in height - good-looking.

❤ (ten) floor installation

The floor can be installed on the second day of the wooden door installation. If it goes well, it is also a day. Floor installation needs to pay attention to the following issues:

1, before the floor installation, it is best to allow manufacturers to come and survey whether the ground needs leveling or local leveling, some decoration companies or renovation teams will recommend students leveling or local leveling, to the actual survey of the floor manufacturers prevail;

2. Before the floor is installed, the floor of the home's paving floor should be cleaned and the ground must be kept dry. Therefore, do not use water during the cleaning process.

3, floor installation, if conditions, the floor must be cut in the corridor.

❤ (eleven) paving wallpaper

On the second day after the floor is installed, the home is cleaned up and the wallpaper can be pasted. If it goes well, it will be the same day. If conditions permit, on the day of paving the wallpaper, the floor should be protected; if it is not conditional, it is okay to clean the leftover wallpaper glue on the floor to the original cleaning. Before paving the wallpaper, try to "don't have anything" on the wall.

❤ (twelve) radiator installation

On the day after the wallpaper was laid out, friends who changed radiators or dismantled the radiators could literally put radiators on the wall. The same is the time of day.

Wooden door - floor - wallpaper - heat sink, this is a generally recognized correct installation order, first install the wooden door is to ensure that the baseboard of the floor can be closely integrated with the door of the wooden door cover; after loading the wallpaper is mainly because of the floor The installation is more dirty, more dust, and serious wallpaper pollution. Again, the principle of "who is the one who is dirty first" is used here again. The final radiator is installed because only the wallpaper on the wall can be installed to install the radiator.

The gradual progress of the renovation process is designed under conditions of various constraints and constraints. Occasionally there are exceptions, such as Holtzmen need to install the floor after the door, but such exceptions are rare in the renovation process.

❤ (13) Switch socket installation

❤ (14) Lighting installation

Loading lights, nothing to say. After the lights were installed, the home was bright and bid farewell to the dazzling glare of the 100-watt incandescent bulbs during the renovation - it felt good.

❤ (15) Hardware ware installation

Before buying good plumbing, bathroom accessories, toilets, drying racks, etc., they are all installed.

After those “big things” were installed, the family was still “cold”. After the fixtures and hardware were installed, the family “lived” and really “lived”. It is not an exaggeration to say that the first time you opened the dragon's water and watched the flow of the water “squeaking and squeaking,” it would be beautiful in your heart. The first time you put your toilet in the house, you will have a sense of accomplishment. A good name - "Virgo."

❤ (16) Curtain rod installation

The installation of curtain rods marks the end of home improvement

❤ (17) pioneering cleaning

Before the pioneering cleaning, do not install curtains. I reminded you in the post on “Interpreting the Curtains”. When pioneering cleaning, homes should not have furniture and unnecessary appliances. Try to keep more "flatness" so that the pioneering cleaning can be thoroughly cleaned.

❤ (18)Furniture approach

With regard to the purchase time of furniture, it is also necessary to first complete the transformation of the water circuit. In this way, we have only a few basic dimensions of furniture to choose from. Therefore, some friends have already rushed to set the furniture before the decoration has begun. Personal feeling is not necessary.

❤ (19) Appliances entering the field

At this time, the entrance of the appliance to enter the field, the installation of the installation, ready to stay!

❤ (20) Home Accessories

Home accessories, the final step of home improvement, and has been transformed from decoration to decoration, including the installation of curtains are part of home accessories. As for the purchase of curtains, it is best to order furniture to avoid style conflicts. Home accessories also include considerations such as buying some green plants, wall paintings, handicrafts, etc.... In short, after your stay, you are free to play.

Third, the two divisions of the decoration process

Anyone who has read the second quarter may feel a bit confused. In order to facilitate the understanding of these 20 steps and some of the points that need to be noted during the period, based on the previous 20 steps, 10 more were added, as follows:

1 Start formalities - 2 self-measurement - 3 pre-design - 4 main body dismantling - 5 door manufacturers to measure - 6 cabinets for the first time - 7 hydropower reform - 8 bathroom waterproof - 9 main material Approach - 10 carpentry - 11 tiling (installation windowsill, floor drain) - 12 installation of hood - 13 cabinets for the second measurement - 14 brush wall paint - 15 kitchen ceiling - 16 gas - — 17 Cabinet Installation (Simultaneous Installation of Sink and Gas Cooker) — 18 Door Installation — 19 Floor Installation — 20 Paving Wallpaper — 21 Radiator Installation — 22 Switch and Socket Installation — 23 Lamp Installation — 24 Hardware Sanitary Ware Installation - 25 curtain rod installation - 26 pioneering cleaning - 27 furniture approach - 28 appliance installation - 29 home accessories - 30 moving

(I) Four-step division of the whole process of renovation

Broadly speaking, according to the 20 links mentioned at the beginning of the article, the whole process of decoration can be roughly divided into the following four sections:

1, design links; (1)

2, construction links; (2-6)

3, the installation process; (7-16)

4, finishing links. (17-20)

(B) The six-step division of the entire renovation process

According to the characteristics of the project, according to the 30 links just mentioned, the entire process of renovation can also be divided into the following six steps:

The first step: design ideas; (3)

The second step: main body demolition; (4)

Step 3: Covert Projects; (7)

Step 4: Covering the Project; (10, 11, 14, 15, 19, 20)

Step 5: Installation phase; (17, 18, 21, 22, 23, 24, 25)

The sixth step: the closing stage. (26,27,28,29,30)

Specific instructions:

1. In order to distinguish from bees, we must first have design ideas;

2. The demolition of the main body is to completely transform the rough house into a construction site. The contents of the main demolition reform mentioned above have just been said - "demolition of walls, walls, spade shovel, demolition of heating, change steel windows, etc.", and some of the woodworking;

3, hidden projects, it is equivalent to "medical surgery." Covert projects must be done first, that is, people often say "renovation begins, and hydropower first";

4, covering the project, as if to give home "clothing." Carpenter's window covers, cornices, bricklayers, brickwork, installation of window sills, oil painters - wood, tile, oil are three basic projects, behind the pinboard ceiling, paving the floor, after the wallpaper is over Even if the clothes are worn out;

5, the installation phase, mainly to complete the functional realization. Including: cabinets, wooden doors, radiators, switch sockets, lighting fixtures, hardware, sanitary ware, curtain rods... Each item has its established function;

6. In the closing stage, to put it plainly, it is to add the factors that do not constitute “can move”. 1 Preliminary Design - 2 Main Body Dismantlement - 3 Hydroelectricity Renovation - 4 Carpentry - 5 Tiling - 6 Brush Wall Paint - 7 Kitchen & Bathroom Ceiling - 8 Cabinet Installation - 9 Door Installation - 10 Flooring Installation - -11 Paving Wallpaper - 12 Radiator Installation - -13 Switching Socket Installation - -14 Lighting Fixture - -15 Hardware Ware Installation - 16 Curtain Rod Installation - 17 Vast Cleaning - 18 Furniture Approach - 19 Appliance installation - 20 homes are completed, roughly in accordance with these 20 steps.

❤ (a) pre-design

In the same way, the difference between humans and bees is that the construction of bees is a reflection of instincts. Before humans are built, ideas and frameworks are first formed in the mind. Therefore, if the home improvement compared to a battle, then the pre-design home improvement is the battle of the "war plan" is the home improvement "soul link."

In the previous design, one of the things that my friends must do is to make a detailed measurement of their own room. Don't be lazy. It's best to measure it yourself. The main contents of the measurement include:

1. Identify the area involved in the renovation process. Especially the tiling area, wall paint area, wallpaper area, floor area;

2, clear the main wall size. In particular, it is necessary to design the wall size of the furniture later.

❤ (2) Demolition of the main body

Into the construction phase, the main demolition reform is the first project on the first, mainly including the demolition of walls, walls, spade shovel, demolition heating, change steel windows and so on. When the main body is dismantled and reformed, it is to put the framework of the construction site first.

❤ (III) Hydropower Rehabilitation

Before the transformation of the water circuit, the demolition of the main structure should be basically completed. Between the two stages of hydropower reform and main body demolition and reform, some relevant suggestions have been made on the positions of the water inlets and hoods reserved by developers. mainly include:

1. Check if the position of the socket outlet affects the installation of the hood in the future;

2, see if the location of the water meter is appropriate;

3, to see if the position of the inlet is convenient for installing the sink later.

For the first measurement of the cabinet, a slightly experienced friend can do it completely. After the waterway is completed, it is best to do the waterproofing of the bathroom. The kitchen does not generally need to be waterproof.

❤ (four) woodworking

Carpenters, bricklayers, and oil workers are the "three brothers" in the construction process. The basic order of appearance is: wood-tile-oil. The basic appearance principle is - who is dirty and who is the first. "Who is dirty? Whoever is above" is also one of the basic principles that determine the order of home improvement.

❤ (five) tiling

In the process of “bricklayer”, the following three steps are also involved:

1. The installation of door stone and marble windowsill. The installation of the door stone can be done together with the paving tiles, or after the paving tiles, the installation of the marble window sill is usually done after the window cover is done. The marble worker will prepare the glass glue, and the marble and the window cover are sealed with glass glue. Now.

2, the installation of floor drain. The floor drain is the first one to appear in the home improvement hardware because it needs to be installed together with the floor tile. Therefore, when friends start shopping for building materials, they should try to buy a floor drain.

3, hood installation. The hood is the first appearance of the appliance. After the kitchen tiles are laid, you can consider installing the hood.

“The bricklayer's second cousin” leaves the floor. At this time, the cabinet can be measured for the second time. Accurately speaking, after the wall tiles have been attached and the hood is installed, the second measurement of the cabinet can be performed.

❤ (six) brush wall paint

The “oil worker's third child” entered the field and mainly completed the work of basic wall surface treatment, brush finish, and painting of furniture hit by the “wooden boss”. For friends who are ready to put on wallpapers, they only need to let the “oil worker's third child” do grassroots work on the wallpapered wall.

❤ (7) kitchen ceiling

Cupboard ceiling as the installation of the first team, or in the continuation of the home "packaging." At the same time as the kitchen ceiling, the kitchen's moisture-proof ceiling lamp and exhaust fan (Yuba) should have been bought. It is best for friends to install ceiling lights and exhaust fans (bath heaters) at the same time, or to leave heads and openings.

❤ (8) Kitchen cabinet installation

After the ceiling is over, the cabinet door can be installed. If it goes well, one day can be completed. At the same time there is a sink (can not include water and water parts) and gas stove, the best coordination of the property before the installation of the gas pass, because the gas stove installed after the need to test gas.

A lot of friends kitchen and bathroom ceiling selection of waterproof gypsum board with waterproof paint, decoration team offer is generally more than 120 yuan per square meter, than the average aluminum buckle plate, PVC buckle plate ceiling should be expensive. The gypsum board ceiling looks relatively flat from the visual, but once there is a problem with the top surface water pipe, or if the leakage above the floor requires downstairs maintenance, etc., the gypsum board ceiling needs to be removed as a whole, which is much more costly than the buckle board ceiling. Therefore, we need to be cautious when choosing plasterboard ceilings.

❤ (nine) wooden door installation

On the second day of cabinet installation, as soon as the wooden door measurement was completed more than one month ago, it is now possible to install it. If it goes well, it is also the time of the day. The hinges, door locks, and suctions to be installed at the same time when the door is installed. Prepare related hardware in advance.

If you want the wooden door manufacturers to install window covers and gargles, they should be measured together when the wooden door manufacturers measure them, and they should be installed on the same day that the wooden door is installed. At the same time, the installation time of the marble window sill should be considered wrong. After installation. Remarks: The production period of wooden doors is generally one month. Therefore, in order to make the construction period close together, it is necessary to allow door manufacturers to measure the size of door openings as soon as possible after the completion of main body demolition. With regard to the handling of door openings, we need to pay attention to the fact that if the height of the door openings is inconsistent, the workers need to be treated as if they are equal in height - good-looking.

❤ (ten) floor installation

The floor can be installed on the second day of the wooden door installation. If it goes well, it is also a day. Floor installation needs to pay attention to the following issues:

1, before the floor installation, it is best to allow manufacturers to come and survey whether the ground needs leveling or local leveling, some decoration companies or renovation teams will recommend students leveling or local leveling, to the actual survey of the floor manufacturers prevail;

2. Before the floor is installed, the floor of the home's paving floor should be cleaned and the ground must be kept dry. Therefore, do not use water during the cleaning process.

3, floor installation, if conditions, the floor must be cut in the corridor.

❤ (eleven) paving wallpaper

On the second day after the floor is installed, the home is cleaned up and the wallpaper can be pasted. If it goes well, it will be the same day. If conditions permit, on the day of paving the wallpaper, the floor should be protected; if it is not conditional, it is okay to clean the leftover wallpaper glue on the floor to the original cleaning. Before paving the wallpaper, try to "don't have anything" on the wall.

❤ (twelve) radiator installation

On the day after the wallpaper was laid out, friends who changed radiators or dismantled the radiators could literally put radiators on the wall. The same is the time of day.

Wooden door - floor - wallpaper - heat sink, this is a generally recognized correct installation order, first install the wooden door is to ensure that the baseboard of the floor can be closely integrated with the door of the wooden door cover; after loading the wallpaper is mainly because of the floor The installation is more dirty, more dust, and serious wallpaper pollution. Again, the principle of "who is the one who is dirty first" is used here again. The final radiator is installed because only the wallpaper on the wall can be installed to install the radiator.

The gradual progress of the renovation process is designed under conditions of various constraints and constraints. Occasionally there are exceptions, such as Holtzmen need to install the floor after the door, but such exceptions are rare in the renovation process.

❤ (13) Switch socket installation

❤ (14) Lighting installation

Loading lights, nothing to say. After the lights were installed, the home was bright and bid farewell to the dazzling glare of the 100-watt incandescent bulbs during the renovation - it felt good.

❤ (15) Hardware ware installation

Before buying good plumbing, bathroom accessories, toilets, drying racks, etc., they are all installed.

After those “big things” were installed, the family was still “cold”. After the fixtures and hardware were installed, the family “lived” and really “lived”. It is not an exaggeration to say that the first time you opened the dragon's water and watched the flow of the water “squeaking and squeaking,” it would be beautiful in your heart. The first time you put your toilet in the house, you will have a sense of accomplishment. A good name - "Virgo."

❤ (16) Curtain rod installation

The installation of curtain rods marks the end of home improvement

❤ (17) pioneering cleaning

Before the pioneering cleaning, do not install curtains. I reminded you in the post on “Interpreting the Curtains”. When pioneering cleaning, homes should not have furniture and unnecessary appliances. Try to keep more "flatness" so that the pioneering cleaning can be thoroughly cleaned.

❤ (18)Furniture approach

With regard to the purchase time of furniture, it is also necessary to first complete the transformation of the water circuit. In this way, we have only a few basic dimensions of furniture to choose from. Therefore, some friends have already rushed to set the furniture before the decoration has begun. Personal feeling is not necessary.

❤ (19) Appliances entering the field

At this time, the entrance of the appliance to enter the field, the installation of the installation, ready to stay!

❤ (20) Home Accessories

Home accessories, the final step of home improvement, and has been transformed from decoration to decoration, including the installation of curtains are part of home accessories. As for the purchase of curtains, it is best to order furniture to avoid style conflicts. Home accessories also include considerations such as buying some green plants, wall paintings, handicrafts, etc.... In short, after your stay, you are free to play.

Third, the two divisions of the decoration process

Anyone who has read the second quarter may feel a bit confused. In order to facilitate the understanding of these 20 steps and some of the points that need to be noted during the period, based on the previous 20 steps, 10 more were added, as follows:

1 Start formalities - 2 self-measurement - 3 pre-design - 4 main body dismantling - 5 door manufacturers to measure - 6 cabinets for the first time - 7 hydropower reform - 8 bathroom waterproof - 9 main material Approach - 10 carpentry - 11 tiling (installation windowsill, floor drain) - 12 installation of hood - 13 cabinets for the second measurement - 14 brush wall paint - 15 kitchen ceiling - 16 gas - — 17 Cabinet Installation (Simultaneous Installation of Sink and Gas Cooker) — 18 Door Installation — 19 Floor Installation — 20 Paving Wallpaper — 21 Radiator Installation — 22 Switch and Socket Installation — 23 Lamp Installation — 24 Hardware Sanitary Ware Installation - 25 curtain rod installation - 26 pioneering cleaning - 27 furniture approach - 28 appliance installation - 29 home accessories - 30 moving

(I) Four-step division of the whole process of renovation

Broadly speaking, according to the 20 links mentioned at the beginning of the article, the whole process of decoration can be roughly divided into the following four sections:

1, design links; (1)

2, construction links; (2-6)

3, the installation process; (7-16)

4, finishing links. (17-20)

(B) The six-step division of the entire renovation process

According to the characteristics of the project, according to the 30 links just mentioned, the entire process of renovation can also be divided into the following six steps:

The first step: design ideas; (3)

The second step: main body demolition; (4)

Step 3: Covert Projects; (7)

Step 4: Covering the Project; (10, 11, 14, 15, 19, 20)

Step 5: Installation phase; (17, 18, 21, 22, 23, 24, 25)

The sixth step: the closing stage. (26,27,28,29,30)

Specific instructions:

1. In order to distinguish from bees, we must first have design ideas;

2. The demolition of the main body is to completely transform the rough house into a construction site. The contents of the main demolition reform mentioned above have just been said - "demolition of walls, walls, spade shovel, demolition of heating, change steel windows, etc.", and some of the woodworking;

3, hidden projects, it is equivalent to "medical surgery." Covert projects must be done first, that is, people often say "renovation begins, and hydropower first";

4, covering the project, as if to give home "clothing." Carpenter's window covers, cornices, bricklayers, brickwork, installation of window sills, oil painters - wood, tile, oil are three basic projects, behind the pinboard ceiling, paving the floor, after the wallpaper is over Even if the clothes are worn out;

5, the installation phase, mainly to complete the functional realization. Including: cabinets, wooden doors, radiators, switch sockets, lighting fixtures, hardware, sanitary ware, curtain rods... Each item has its established function;

6. In the closing stage, to put it plainly, it is to add the factors that do not constitute “can move”.

Flooring Nature Flooring Wallpapers Wood Doors Furniture Decoration Design Decoration Decoration Company Decoration Style Home Wallpapers Glass Tiles Kitchen Cabinets Doors Kitchen Ceiling Crafts Glass Glass Furniture Marble Cabinets Kitchen Doors Floor Tiles Home Crafts Glass Doors Kitchen Glass Sliding Doors Bathroom Doors Bathroom Doors Size Bathroom Size Toilet Ceiling Overall Toilet Bathroom Design Toilet Waterproof Bathroom Floor Tile Toilet Leakage Home Decoration Home Furnishing Decoration Home Furnishing

Backing Mesh

Backing Mesh,Mosaic Tile,Waterproof Building Materials

Mosaic Mould For Paving,solvent for pigment Co., Ltd. , http://www.nbpigment.com