In the rainy season, attention is paid to the protection of moisture and the expert guides the treatment of the surface.

>>>How to perform wall construction in the rainy season

With the advent of the rainy season, many owners were caught off guard and failed to close doors and windows in time, resulting in the floor being soaked and causing a lot of losses. In this regard, industry experts stressed that the moisture season in the rainy season can not be overlooked in the home improvement season, and put forward some suggestions on the wet season moisture.

Experts in the industry have warned that wood products are prone to blistering, deformation, etc. after being exposed to water. Repairs are difficult and can only be replaced; and some projects that are under construction are seriously affected by water and need to be reworked. This will not only cause problems for the owners. Large losses will also cause a lot of inconvenience, so in the rainy season, the owners must pay attention to close the doors and windows.

1. After the floor has been leached, it should be checked in time so that the loss can be minimized. The inspection method is: Open the floor bead, observe the water through the expansion joint between the floor and the wall, if there is, it should be drained in time, if the floor is only the surface is wet, then immediately wipe the surface rain.

2. When the water absorption of the door cover is damp, it is generally reflected in the bottom, and there will be blistering, bloating and deformation of the paint. If the door sleeve only swells and the gap between the door frame becomes larger, it can be resealed with glass glue. However, if the door sleeve is seriously deformed and affects the normal opening and closing of the door, the door sleeve must be replaced. If it is lacquer blistering, you need to polish the door sleeve and paint again. In order to avoid chromatic aberration, it is recommended that the door lining should be entirely lapped and painted instead of just treating the blistering portion.

3, if the windowsill is made of wood, in addition to pay attention to whether the windowsill deformation, in order to replace in time, but also pay attention to whether the stagnant water through the wood itself or its gap with the wall penetration into the windowsill below, dampen the surrounding wall, If yes, it needs to be processed in time.


4. During the construction of the rainy season, it is necessary to pay attention to the rational arrangement of the process, and do not do oil work as much as possible during heavy rain.

5. When laying tiles on a rainy day, it is best to cover kraft paper or plastic cloth on the surface of the cement, and try to keep it away from the water source so as to prevent the cement from becoming lumpy after being dampened or wet. However, the wiped cement is still affected by the humidity of the air, which slows down the solidification rate. Therefore, after paving the floor tiles, you can't step on them immediately. You should set a springboard to make it easier to pass.