Explosion-proof valve installation requirements

Working conditions

1. Pressure range: -10kPa~+20kPa

2. Temperature range: -20 ° C ~ 395 ° C

Edit this section of the installation site

Boiler body that is prone to implosion and on the front flue of the precipitator

Installation requirements

1. Installation of explosion-proof valve can be installed at any angle

2. The installation position between the two explosion-proof valves is at least 200mm apart.

High quality hook and loop fastener. Provide double strong grip of mesh.

Self adhesive procedures: on the basis of standard  tape and special tape, using the high temperature back-glue
fuse machine to make the glue melt on their back, then cover one layer of oiliness release paper. 
The product is divided into 3 types: 1.normal adhesive , which is with low melting point, and applicable to use in the winter, 
and low temperatured conditions, just common stickiness. 

Velcro Tape

Velcro Tape,Strong Velcro Tape,Eco-Friendly Velcro Tape,Self-Adhesive Hook And Loop Tape

Hebei Charlotte Enterprise Co., Ltd. , http://www.cnscreening.com