Second-hand housing decoration key difficulties detailed

Many people think that after buying a second-hand house, just spend some money to renovate the house, which is almost like the new one. However, if you choose an older house with a longer house age, special attention should be paid to house decoration so as not to cause problems in future life.

First, the second-hand housing original strong electric system

1. The strong electric lighting and the socket share a common circuit, and the wire is an aluminum core wire or a small-diameter copper core wire. Once several electric appliances are used in the process of use, the main switch is quasi-jump and cannot be used normally.

2. At the end of the last century, the State had conducted the process of adding capacity to the second-hand house strong electricity. The general compatibilization part was limited to the air-conditioning circuit, and it could basically guarantee the use, but most of the added-capacity cable routes were trunking or direct sheathing lines. Walking outside the wall seriously affects the aesthetic appearance of the decoration;

3, the old room's switchboard settings are generally older, and the power ratio is not reasonable and needs to be reset.

Solution: Because the use of high-power electrical appliances in real life, far more than ten years ago can be tolerated distribution systems, Longxuan hydropower according to second-hand housing strong electricity system organization situation, about 60 square meters of two rooms and one living room strong system Reasonable configuration: air conditioning is generally a single-way setting, single lighting settings, common outlet single-loop settings, kitchen and bathroom sockets as required to do a single-loop setting. In addition to the total loop, the general old house is set to have a distribution circuit of 5 to 7 roads, which can basically meet the needs of the next decade.

II. Problems of weak current system in old houses' hydropower reform

Phones, TVs, and intercoms are all outside wall windings and all need rewiring

Solution: We will first ask the owners, in the future need to use residential broadband or install ADSL, because the two methods of LAN wiring are not exactly the same, and then determine where the home where the router is located, Internet sharing problem solving; for the old house In the intercom system of hydropower reform, general properties are not very manageable, and some do not even have property companies. They need to operate according to the specifications to ensure sound or images are clear.

III. Problems of the water supply system in the old house's hydropower reform

The old galvanized pipe + the old valve can't hold the water, which is not easy to use

Solution: According to the old iron pipe water supply, first remove the original pipe, determine the new kitchen and bathroom showers, wash basins, toilets, washing machines, vegetable sinks. The location of the water supply. Longxuan Hydropower uses the fourth-generation PE-RT (heat-resistant polyethylene) home pipe instead of the original pipe to completely solve the water supply problem; for the replacement of the total control valve, it is necessary to greet the property company or the neighborhood committee in advance and explain to the neighbors of the same building. The reasons for stopping the water for a while, under normal circumstances, we all understand, and then have to replace the total valve at 9:30 in the morning to avoid cooking and other peak water use.

IV. Anti-leakage problem in the old house's hydropower reform

The bathroom and kitchen waterproofing layer of the old house has been in disrepair for a long time, and the leakage prevention effect has been greatly reduced. If you ignore this piece during the renovation, in the future the owner will surely suffer from flooding and the mildew.

Solution: Close the water test for the toilet Before decorating the second-hand house, first of all, the decoration worker should be asked to close the water test for the restroom, and check how the previous waterproof treatment is done. The method is: block the floor drain, put 5 cm of water in the toilet, observe for 24 hours, and then go to the neighbor's house downstairs to check, if there is no leakage phenomenon, prove that the waterproof treatment is done well; if it leaks, you must ask the property to re-waterproof After processing, after the waterproof treatment, wait for the ground to completely dry and then tile again, otherwise the ground will crack.

V. Solving cracking and cracking on the wall

The old house is like a woman of old age. No matter how heavy the wild goose is, how can the years appear on the smooth skin. The same is true of the walls of old houses. Cracking and cracking are common occurrences. However, if you do not perform the primary treatment, refresh the paint directly. It's like if you don’t solve a skin condition, you’ll have to stop the symptoms.

Solution: painting the wall is the key to the old wall of the old house will appear cracking, peeling phenomenon, so when the decoration of the wall, we must pay attention to do a good job at the grassroots level, generally good decoration company in the wall leveling After that, it will be coated with an interface agent, the interface agent will have a moisture-proof effect, and it can also play a role in protecting the latex paint. Next is the putty, the putty paste should be made of waterproof putty, the putty should be scraped three times, and finally the brush Latex paint. If the wall is to be colored, paint it accordingly.

Six, increase the necessary switch socket

With more and more appliances used in homes, lighting and lighting equipment are becoming more and more colorful, so there are many places where switches and sockets need to be placed. Well, before the renovation, we must do a good job of wiring in advance, which places need to be placed in the future, to do a good job in advance planning, and the old house reserved switches and sockets are generally not enough. In general, a room must have at least 3 outlets. There should be no fewer than 15 sockets in a two-bedroom residential building and no less than 8 switches. The switch height of the same room should be the same, the general switch is 1.4 meters from the ground, and the outlet is 0.3 meters from the ground. The switch between the suspension and the living room should be set in a place easily accessible to the owner.

In short, the second-hand housing hydropower reform is a project with a large amount of work and requires a high degree of professionalism. It is difficult for non-specialized companies to complete a complete hydropower system, especially a strong electric power system. Decoration also does not contribute to the quality of the decoration company itself. Therefore, the decoration of old houses should be preferred by professional companies for decoration.

Second-hand House Decoration Notice Socket Switch House Renovation House Paint Living Room Wall Color Decoration Find Decoration Company How Do You Decorate Living Room Bathroom Tile Toilet Door Bathroom Tile Color Bathroom Wash Basin Toilet Waterproof Toilet Leaking Tile Rubber Kitchen Tiles

1 Thick Brass Padlock,lock body made of brass, durable, lightweight, cylinder can be copper or iron, copper and iron key can.

2 Shackle made of iron chrome, nickel, or spraying. In addition, it can also make stainless steel or copper hook hook. Shackle can be extended according to customer needs to 40MM 60MM 90MM.

3 Lock body surface may print the company name, pattern, number, print mode is molded or laser
4 The lock cylinder according to customer's needs, to make keyed different, flush keys, key executives
Scope:
Our products are widely used in electricity, engineering industries lockout / tagout, gas pipeline, meter boxes, metering boxes, factories, property, mines and so on.

high quality11

Heavy Duty Thick Type Brass Padlock

Square Thick Brass Padlock,Hammer Brass Padlock,Heavy Duty Solid Brass Padlock,Heavy Duty Brass Padlock

Shengping Safety Protection Locks Manufacturer , http://www.chinajiuzhou.com