How to decorate the house? House decoration considerations

Many people will say that they have bought a house. The decoration can be directly all-inclusive or half-packed, so that we don't have to worry about it. Just take a few trips a day and look at the supervision. However, many places where problems may arise in the later period, you don't know. It is not troublesome to have problems after just finishing the decoration! So in Xiaobian's view, even if the decoration is all-inclusive, how to decorate the house and pay attention to the house decoration. These two issues, we should also understand! Let's take a look at the decoration home network Xiaobian.


房子怎么装修才好


How to decorate the house - process steps


1. Before you decorate, you must first measure the data on the house, and then do the decoration design. Consider the functionality and aesthetics of each room. You can find professional personnel to help design and check.


2. Before the formal renovation and construction, the main part should be demolished. According to the design drawings, all the infill walls, doors and windows, water and electricity pipes that need to be removed should be removed, and then the construction site frame should be set up.


3, the first step of the renovation project must be to do hydropower transformation, because many pipes and circuit pipes will buy walls and underground, so if you do not want to do this step, it will lead to subsequent rework.


4. At the same time as the hydropower transformation, you can talk about the woodwork, please go to the site, measure the riser, decorative ceiling, plaster line and other data and start production. These will be used later, you can prepare in advance, so that the construction period will be shortened.


5, now tiling, the kitchen, the door stone, window sills and other places that need to be paved with wall tiles. The floor drain of the kitchen, bathroom and balcony should be installed first and leaked. A cooker hood should be installed after the kitchen is tiled.


6. Now deal with the wall without wall tiles, want to be the base layer, and then brush the finish. If you want to do wallpaper, then only the base layer can be processed.


7. Now install the ceiling of the kitchen and bathroom. The exhaust fan, Yuba and ceiling lamp should also be installed at this time. The kitchen cabinets can be installed after the above is completed.


8. Now install the doors of each room. After the installation is complete, lay the wooden floor, and then paste the wallpaper.


9. At this step, you can install various electrical equipment. If you want to install the radiator, you should do it after completing the wallpaper. Install the radiator and install the hardware ware.


10. After the decoration is completed, it is necessary to clean it before installing curtains and moving into furniture appliances.


House renovation notes:


1. Check the original waterproof condition inside the house. For example, whether there is accumulated water inside the caisson pool, carefully observe whether there is water seepage in the corner of the house, and see if there is any complaint from the downstairs. This is very important. If there is a problem, you need to find a management office.


2. Carry out basic engineering according to the designed design. It contains walls, windows, stairs, etc. that need to be removed.


3. Then carry out the red brick masonry construction project to make the space pattern more beautiful and reasonable.


4, down is the hydropower transformation, arrange the use of each space. This is a concealed project. It is good or bad and has a direct impact on future life.


5, life sockets must not be afraid of more, than a few more than expected. Strong power and weakness should be kept at a distance of 20 cm.


6. The hydraulics enter the market, mainly for the ground, wall, bathroom, kitchen waterproof, etc., which is to lay floor tiles and tiles. Here you need to pay attention to the inspection of the empty drum phenomenon of floor tiles and tiles.


7. When the woodworker completes the ground, the woodworker inserts it in and enters the field flexibly. The woodwork is mainly for home-made furniture. Such as doors, door covers, backgrounds, ceilings.


房子怎么装修才好


The above detailed answers are about the two aspects of how to decorate the house and the process steps of decorating the house. Although you may be the all-inclusive decoration plan, it does not prevent you from testing their construction. The owners are satisfied, but some owners have high requirements, and some owners are not very demanding. The decoration of the house can reflect the owner's fashion and taste, so it should not be ignored! If you want to know more information, please continue to pay attention to the decoration home network.



More related wonderful reading:

How to decorate the old house? What do you pay attention to in the old house decoration design?

How to decorate a house? What does a well-decorated house include?

How to decorate a house without a balcony? No balcony decoration method

How to decorate the house? What are the styles of house decoration?

How to decorate a house without a living room? What is the renovation process?

Dyes intermeidates are important raw material for different dyes.  Dyes intermidates can include many products, we mainly supply Sulfanilic Acid & Sodium sulfaniliate. Sulfanilic acid is mainly used for azo dyestuff, such as: acid dyes, direct dyes and so on. Sodium sulfaniliate is also mainly used for acid dye, direct dyes and reactive dyes.

*Related Products:sulphanilic acid.

Organic Intermediate

Dyes Intermediate,Sulfanilic Acid,Sodium Sulfanilate,Acid Dyestuff Intermediates

SJZ Chenghui chemical co ltd , https://www.chenghuichemicals.com