Toilet pipe installation standards and precautions

Hydropower installation is a concealed project, which is extremely important. If the bathroom water pipe is improperly installed, various problems will occur, such as leakage, etc., so the bathroom is a big event and needs special attention, especially the installation of the water pipe in the bathroom must be strictly in accordance with the standard. Come and understand the precautions for bathroom plumbing installation. Next, Xiaobian will introduce you to everyone!

The standard for the installation of toilet pipes mainly includes how to install the toilet pipes and what precautions for the installation of the toilet pipes.

First, how to install the bathroom water pipe

1, the general bathroom has divided hot and cold water pipes, the material is mostly PPR pipe, the distance between the hot and cold pipes can not be too close.

2, bathroom water pipes are from the roof, which can reduce the chance of human damage. The interface and exit of the hot and cold pipe must be parallel. Generally, the left side is hot and the right side is a cold water pipe.

3, the pipeline design should be to avoid bending, as far as possible from the circuit. Finally, the positional slope of the pipe clamp should also meet the demand, and each valve should be installed flat to facilitate future use and maintenance.

4. The cold and hot water pipes are all in the wall. When the groove is opened, the depth of the groove should be checked. The hot and cold water pipes cannot be in the same groove.

5. When installing the water heater inlet and outlet, the inlet valve and the inlet valve must be considered and installed in the corresponding position.

6. When installing the hot water pipe, pay attention to the difference between the water inlet and the water outlet of the water heater, the water inlet is connected to the main valve, and the water outlet is connected to the bathroom pipe. After installation, first open the valve to confirm that there is no water leakage, etc. Finally, install the faucet, shower, etc. in the bathroom. The shower hose height is between 1.8m and 2.1m.

7. Pressure measurement process of bathroom water pipe installation: Before the pressure test, the valve should be closed after the water pressure test, and the end of the pressure test pipe should be sealed and slowly filled with water. After the water is filled, the seal is checked, and then the pressure is manually increased. After the voltage regulation, half an hour. The pressure drop within the test is not more than 0.05Mpa.

Second, the toilet water pipe installation precautions

1. The tube is changed to the dark tube, and the water pipe is buried in order to be beautiful.

2. Install a hot water pipe. Households with gas water heaters, leading the pipeline to the bathroom, the home of the electric water heater is divided into the water heater in the bathroom and the kitchen, respectively, the hot water pipe is nearby. Note: The PPR pipe is divided into cold and hot water pipes, the corresponding pipe wall and pressure resistance are different, and the hot water pipe wall is thick.

3, change the position of the valve water meter, the water pipe total valve is changed to a low position, or even wrapped up, which brings certain hidden dangers to the maintenance and work in the future. It is recommended to put the water main valve in a relatively good open position. For example, on the countertop, the pipe behind the valve is then treated in a low position, and the washing machine moves to the ground or the faucet leads the balcony to wash the mop and water the flowers.

4. Change the heating pipe and move the heating to the position where the furniture is conveniently placed, such as under the window sill.

It should be noted that the quality and scientificity of the installation of the bathroom water pipe must be high. Do not underestimate the installation of a water pipe. The installation of a good bathroom pipe will help the use of the bathroom and the elimination of the odor. I hope the above article can help. everyone.

The UV coating of 5.0mm SPC Vinyl Flooring is another shield for the top layer of SPC Flooring , it contains ceramic components and make the surface scratch – resistant to different damage.

5.0MM SPC Vinyl Flooring also use UV layer to cover the decor film on SPC Vinyl Flooring to make it anti-fading to sun light near window or any other indoor environment.

That can adjust the shinning degree of flooring surface, after UV coating processing the degree of light reflecting on flooring surface can be perfectly adjusted to around 5-7 degree, and make the decor of spc flooring looks very real and elegant as solid wood.

5.0mm SPC Vinyl Flooring

5.0MM SPC Vinyl Flooring,SPC Vinyl Floor,SPC Vinyl Plank Flooring,Wood Plastic Vinyl Flooring

GreenOmni Surface Co., Ltd , https://www.greenomnifloors.com