What are the construction projects and precautions included in the renovation

Half bag is a way between clearing and half bagging. The construction party is responsible for the procurement of construction and accessories, and the main materials are purchased by the owners. The advantage is that the higher value of the main materials can be purchased by themselves to control the cost of the bulk. The owner of the accessory with lower value is not easy to make clear, and the purchase by the construction party is more at ease. What are the construction projects and the precautions included in the renovation ?

What kind of construction projects are included in the renovation package:

1. Responsible for indoor structural transformation (such as wall removal or new wall construction);

2. Responsible for hydropower renovation construction (water supply and drainage design and installation, circuit design and installation, sanitary ware installation, etc.);

3, responsible for mud construction (backfilling, ground leveling, waterproof treatment, wall tiles and floor tiles, etc.);

4, responsible for wood construction (ceiling, modeling and production of some of the scene production of furniture, etc.);

5, responsible for paint construction (wall, wallpaper or latex paint, furniture paint, etc.).

What are the half-packaged ingredients?

In addition to the contents of the above construction project, half of the package includes the purchase of some materials. Mainly include: cement, yellow sand, red brick, water pipe, wire, network cable, switch panel, gypsum board, wood board, plug board, nine PCT board, plywood board, latex paint, caulking agent, adhesive tape, hardware (nails , screws, etc.) There are many kinds of these auxiliary materials and they should also be noted in the contractual agreement. It is usually purchased by a decoration company. Otherwise, it is difficult for consumers to make it clear and it is also very troublesome.

There is a pit here. Please note that before the signing, the decoration materials given by the decoration company are brands, but when the construction is really done, some unknown brands will be used. Therefore, the industry is paying attention to the fact that before signing the contract, the decoration company should clearly list the brand, quantity, and price of these materials, as well as any problems with the original materials, replacement of any brands, or solutions. Write clearly, do not list clear and not sign the contract, and all must be written in the contract. In short, the more detailed the contract, the less likely it will be to be pitted in the later period.

Half-package project notes:

1. First, it is clear that half-packing and half-packing refer to the “four-way and one-leveling” project in the general sense of the house. This includes mainly water, electricity, ventilation, network access, and floor and wall leveling projects.

2. The water in the half package mainly refers to the laying of the water pipe according to the owner's requirements to the required position, including the two parts of the water discharge and the water intake, which generally include the water in the kitchen pot in the kitchen, the toilet bowl in the bathroom, and the shower room. Mop pool, washstand, washing machine.

3, half of the ventilation package, the general developer has been connected, mainly with the kitchen stove, natural gas water heater supply unit associated.

4, in the half packet of electricity, understanding is relatively easy, all electricity must be energized, electricity means laying wires, plug settings, switch settings.

6. The leveling projects in the semi-packet include: guest restaurant, primary and secondary bedroom, balcony wall surface formation, mainly referring to the latex paint project (some people may request to brush Nippon Paint), the background wall project, the ceiling project in the design project, and Part of the owner's wallpaper project.

7. The other parts of the semi-envelope project that must have been completed by the decoration company also include the basics of door covers, that is, the extent to which the finished doors can be directly installed.

8, semi-envelope project will also appear to fight wall, wall, packaging pipe (outside of the water pipe to conceal the part), door pressure stone installation.

9, half of the package decoration company will also talk to you about garbage clearance freight, material transportation fees, here need to pay attention to, first, he will certainly say that the material transport only transported B purchase materials, such as cement lime, A purchase regardless, such as flooring Brick and so on.

10, half of the package may be half a package to the decoration company's ceiling, ceiling kitchen and toilet, this is how Bao Gong Bao material or how to, to clear the material brand, price and installation.

11, half a package may also be half a package to the decoration company there are cabinets, mainly including wine coolers, storage cabinets, shoe cabinets, wardrobes, etc., need to pay attention to what materials do cabinet, there is no door, there is no drawer, there are Several, including no hinges, hanging rods, etc.

12, you may also be half a package, please go to the decoration company's lighting installation, metal pendant installation, and even the toilet in the toilet paper iron man may also be charged it.

13. In the decoration, you may need to cooperate with the decoration company, but the manufacturers have to install the whole cabinets, range hoods, kitchen stoves, floors, natural gas water heaters and so on.

  

Select half-pack repair company should pay attention to:

1. Whether the project is subcontracted: Some decoration companies do not have their own construction teams, they subcontract the project and subcontract one layer, the profit is reduced by one floor, so the subcontracting is more, and the last-level construction party has no construction according to the specifications. Profits, then they will damage the interests of the owners and gain their own interests. Therefore, when signing a contract, the owner must pay attention to the contract and indicate that subcontracting is not allowed.

2. Design: Many companies advertise and design for free. For such a decoration company, we must choose carefully. Design is also a service. If there is no charge, where does the designer's salary come from? In terms of market conditions, the seemingly saved design fee is hit in the auxiliary materials, so as to increase the unit price of the auxiliary materials. If it involves additional items, it is the owner who suffers losses.

3. Accept formal supervision: If the decoration company does not accept it, it means there is no confidence in its own construction level. The owner himself can also print some construction specifications and check his own construction against the construction specifications.

4. Decoration offer: See if the quotation is detailed, whether there is any obvious missing item, and whether the brand and specifications of the materials used are listed. Try to replace the auxiliary materials with other well-known brands, and compare the price increase to see the moisture content of the offer. At the same time, to understand the average price level in the market, especially the part of hydropower, it is the main source of profit for the decoration company.

The above - mentioned construction projects and precautions concerning the renovation and half-packing are briefly introduced here, and we hope to help you! For more information, please visit this website. Stay tuned.

Restaurant furniture restaurant ceiling

Granular carbon processing in the pellet carbon basis is Huahui Company's second series of products. High hardness of pellet carbon can meet different users` demands of various effective particle size of irregular carbon and uniform coefficient.

The high adsorption carbons Granular activated carbon, which is the second main products following pellet carbon of HuaHui Company, can be produced in various distribution, the specification produced through the year includes HP-8X30 (8X30 mesh), HP-12X40,HP-5X7,HP-12X30,HP-20X40 and so on.

Granular Activated Carbon is the extension and supplement on products manufacturing and service of pellet series. This type of activated carbon is finished by machanical breaking and screening of pellet series, therefore, it has the pore characteristics of pellet activated carbon.

Main Technical Parameters of Granular Activated Carbon
 Index Value
Ash (%) `5-15
Hardness(%) ≥85
Density(g/L) 350-500
Iodine No(mg/g) 800-1100
Methylene Blue(%) 180-250
Pore WaterVolume(%) 80-110
Water soluble ash(%) ≤0.5

Granular Activated Carbon(GAC)

Granular Activated Carbon,Granular Shape Activated Carbon,Crushed From Activated Coal,Irregular Shape Carbon

Ningxia Huahui Activated Carbon Company Limited , https://www.huahurcarbon-tr.com