The terrazzo floor is a ground material widely used in public buildings, such as hospitals, schools, and commercial establishments, where terrazzo floors are widely used. Because of the low price of terrazzo floor and its good performance, it has been recognized by many consumers. Today, Xiao Bian wants to introduce everyone's knowledge about the construction process of terrazzo floors and the terrazzo floor construction price. It is not clear what you can learn about!
â— Terrazzo floor construction price
The terrazzo floor can be divided into: traditional terrazzo floor, terrazzo hardener floor and top terrazzo floor. The construction price of these three kinds of ground materials is different.
1, the traditional terrazzo floor is the cheapest, its construction is relatively simple, the price is about 50-80 yuan / square meter.
2, terrazzo seal curing agent on the ground, you need to use Naruite armored concrete seal curing agent, silk concrete sealing curing agent and Na Lute grinding stone seal curing agent, the price is naturally more expensive, about: 80-150 yuan / Square meters.
3, the top terrazzo floor, also known as seamless terrazzo floor, its production not only need Naruite armor, silk concrete sealing curing agent and Na Lute grinding stone seal curing agent, but also need to use cement self-leveling, only Can be made into a seamless floor. The price is naturally more expensive, the price is about: 200 or so square meters.
Note: Regarding the price of terrazzo floor construction, the prices will vary depending on the region. The construction of terrazzo floors is mainly based on the workers' wages and raw material prices. Regarding the price of materials, consumers can go to local building materials stores for detailed consultation.
â— Terrazzo floor construction process
The terrazzo floor construction process generally follows:
Grassroots processing → Alignment → immersion in terrazzo slab → Mortar mixing → Sprinkling water in base layer and brushing cement slurry → Laying cement mortar in combination with prefabricated terrazzo slab → Curing grouting → Stitching skirting board → Pickling and waxing process for construction .
1. Primary treatment: Brush the mortar (or spilled concrete) and pulp skin bonded to the base layer, and clean the surface floating soil with a broom.
2. Alignment: According to the floor elevation required by the design drawings, the +50cm line has been projected from the surface of the wall to find out the elevation of the surface of the board and play a horizontal line on the surrounding wall.
3, immersed terrazzo water: In order to ensure the quality of the bond between the mortar leveling layer and the prefabricated terrazzo board, before the paving slabs, the water soaked in the application of the plate, and when the surface is no clear water.
4, mortar mixing: to pay attention to control the amount of water, mix the mortar with a hand into a group, after the dislocation is appropriate, with the shop with the wipe, not too much mixing.
5, grassroots watering and brushing cement slurry: the surface of the grassroots ground cleaned and sprinkled with water (no clear water).
6. Laying cement mortar joint layer and prefabricated terrazzo board: After checking that the brushed cement slurry is not air-dry, you can begin to apply the mortar-bonding layer; when paving the prefabricated terrazzo board in the room, spread it to the surrounding wall with non-full-plate insert. When they are on the side, they should be symmetrical to each other.
7. Curing and filling: Prefabricated terrazzo paving 2 days and nights, after inspection of the surface without breakage, emptying, caulking with dilute cement slurry, and clean the overflowing grout at any time, filling 2/3 height, and then use Terrazzo with the same color as the grout.
8, paste inset skirting board: set before the installation of a special selection, the thickness must be consistent, and the skirting board soaked with water to dry.
9. Pickling and waxing: After the prefabricated stone surface is cleaned, use a cloth or clean linen to dilute the paste into wax. Prefabricated terrazzo boards are polished and waxed in the factory. However, due to the improper protection of the surface layer of the cement slurry during installation and the finished products after installation, the surface layer should be treated before the completion of the unit works, and the oxalic acid powder should be treated. The clean water was scrubbed, then washed with water and the saw was not dried.

Editor's summary: The above essay on the terrazzo floor construction process and the price of terrazzo floor construction has been introduced here. I hope this article will help you. If you still want to learn more about decoration, you can follow our website information channel, exciting content everything!
Floor tiles
A hydraulic gauge adaptor is a device used to connect a hydraulic gauge to a hydraulic system. It is typically a small, threaded component that acts as an interface between the gauge and the hydraulic system.
The adaptor is designed to fit into the hydraulic system's pressure port or test point, allowing the gauge to be securely attached. It ensures a tight seal to prevent any leakage or loss of pressure during testing or monitoring.
Hydraulic gauge adaptors come in various sizes and configurations to accommodate different types of hydraulic systems and gauges. They are often made of durable materials such as stainless steel or brass to withstand the high pressures and harsh conditions commonly found in hydraulic systems.
Overall, a hydraulic gauge adaptor is an essential tool for accurately measuring and monitoring hydraulic pressure in various applications, such as industrial machinery, automotive systems, and hydraulic equipment.
Gauge Adaptor,Oil Gauge Adapter,Hydraulic Gauge Adapter,Oil Pressure Gauge Adapter
Yantai Dongyue Hydraulic Technology Co., Ltd , https://www.deeleap.com